Projects

Projects

High-Speed Railway Project in Saudi Arabia. The project is a double-track standard-gauge electrified railway line with a design speed of 365 km/hour and an operation speed of around 320 km/hour. The project annual capacity is 60 million passengers.

Urban transit projects in Jordan. The projects include the development of light rail systems and the integration with existing and future public transport systems in main cities.

The rail freight transport system includes different projects in Jordan and Saudi Arabia. The projects has been developed for mega tons transportation capacity.

More Projects

These projects includes residential cities,
government housing, mixed-use developments,
commercial developments, and institutional buildings. Major projects in Saudi Arabia in Jeddah and Rabigh cities.

These initiatives aim to restore the historic Hijaz Railway, establishing a strategic north-south transportation corridor connecting Istanbul, Adana, Aleppo, Damascus, Amman, Medina, Mecca, and Jeddah, offering an alternative to maritime transit.

Development of existing railway historic stations and building new railway museums in the Middle East related to the Hijaz railway in Jordan and extended to Syria and Saudi Arabia.


Urban Transit – Integrated Light Rail System

Airport – Amman – Zarqa

2025- 2026

Railway Industry

Founder’s Legacy Project

The project is to develop a light rail system along the Zarqa–Amman corridor using the existing Hejaz railway alignment with extensions to Queen Alia International Airport (QAIA), a branch line to Madaba, and integration with new urban developments such as New City (Amra), thereby treating the project as an integrated LRT network rather than a standalone corridor.

Founder’s Mission

2021- 2025 : Director General

Technical Information

ClientJordan Hijaz Railway Corporation
LocationAmman, JOR
MissionRFP/TOR, PPP Model, Concept Design
Dates2025 – 2026
Project TypeIntegrated urban transit with light rail
Project Length(112) km
Project ValueUS$ 1.2 billion
Design Speed 120 km/hour

Light Rail Transit

Amman – Zarqa

2024- 2025

Railway Industry

Founder’s Legacy Project

The project is to develop a light rail system along the Zarqa–Amman corridor using the existing Hejaz railway alignment. The scope of work is to determine potential ridership, modal shift, fare policy, and operational sustainability, evaluate the existing Hijaz rail corridor between Amman and Zarqa cities with total length of 24 km, recommend building an LRT network by utilizing the existing infrastructure, and provide recommendations on potential Public-Private Partnership (PPP) structures

Founder’s Mission

2021- 2025 : Director General

Technical Information

ClientJordan Hijaz Railway Corporation
LocationAmman, JOR
MissionRFP/TOR, PPP Model, Concept Design
Dates2024 – 2025
Project Type: Light Rail Transit (LRT)
Project Length(24) km
Project ValueUS$ 650 million
Design Speed 120 km/hour

Founder’s Mission

Led the strategic development of the modernization and upgrade concept for the historic Hijaz Railway corridor in Jordan, supporting the vision of establishing a modern freight railway connecting the Kingdom of Saudi Arabia with Jordan, Syria, and ultimately Türkiye as part of a regional rail connectivity initiative. The assignment included concept development, engineering coordination, route optimization, technical evaluation, and feasibility assessment to establish a viable railway corridor aligned with future regional logistics and trade objectives

Hijaz Railway Upgrade

Hijaz Railway Modernization & and Regional Rail Freight Connectivity Program

2024- 2025

Railway Industry

Founder’s Legacy Project

Türkiye, Syria, Jordan, and Saudi Arabia are actively pursuing the revival of the historic early 20th century Hejaz Railway as a modern, cross-border trade corridor. Signed through recent agreements and memoranda of understanding, the project aims to link Europe and Türkiye through Aleppo, Damascus, and Amman down to the Gulf region. This initiative aims to restore the historic Hejaz Railway, establishing a strategic north-south transportation corridor connecting Istanbul, Adana, Aleppo, Damascus, Amman, Medina, Mecca, and Jeddah, offering an alternative to maritime transit through the Strait of Hormuz, Bab el-Mandeb, and Suez Canal. Longer-term plans envision extending the network to Oman, creating a land corridor between Europe and the Gulf of Oman.

Technical Information

ClientJordan Hijaz Railway Corporation
LocationJordan; connecting Saudi Arabia, Syria and Iraq.
MissionFeasibility Study, Concept Design
Dates2024 – 2025
Project Type: Rail Freight
Project Length(430) km
Project ValueUS$ 7.7 billion
Design Speed 125 km/hour

Founder’s Mission

Led the engineering review and redesign to evaluate the existing route infrastructure and superstructure and assess requirements for proposed extensions including the Track Components; rails, sleepers (Ties), ballast and sub-ballast, fastenings, track geometry, and Track Infrastructure; earthworks, bridges and tunnels, level crossings, drainage … etc. 

Hijaz Railway Revival

Hijaz Railway Revival for Passenger Transportation

2021- 2022

Railway Industry

Founder’s Legacy Project

The Project assesses the engineering and technical requirements for upgrading the existing railway corridor and developing proposed extensions, including alignment constraints, constructability considerations, and system compatibility for passenger transport. It covers the Hijaz railway corridor from Qatraneh to Syrianian boarders (Jaber) with total length of 186 km.

Technical Information

ClientJordan Hijaz Railway Corporation
LocationJordan
MissionEngineering Review/ PPP Modeling/ Cost Estimation
Dates2021- 2022
Project Type: Passenger Railway
Project Length(186) km
Project ValueUS$ 1.5 billion
Design Speed 160 km/hour

Founder’s Mission

Led the consruction team for design review, consructability validation and construction for the whole project including:

  • Infrastructure
  • Wet and dry utilities
  • Roads
  • Landscaping
  • Turnkey delivery

King Abdulaziz University Housing Project

2016 – 2018

Commercial/Residential Projects

Founder’s Legacy Project

The KAUHP Faculty Housing Project is a residential development in Jeddah, Saudi Arabia, conceptualized to develop a leading sustainable campus and establish itself as an ICON for campus in the Middle East to follow. The development is to adopt high standards of sustainability, creating a high quality of living and establish itself as a prestigious development.

The residential complex covers a total area of 750,000 square meters including the development of 800 independent villas and 48 apartment buildings designed to accommodate teaching staff and faculty members. The housing community is built close to core campus facilities and incorporates fitness centres/gyms, relaxation zones, and continuous maintenance services. The master plan for the faculty housing project was designed to meet high sustainability and green building standards covering energy, water conservation, and indoor environmental quality.

Technical Information

ClientKing Abdul Aziz University
LocationJeddah – KSA
MissionDesign Review and Turnkey Construction
Dates2016- 2018
Project Type: Commercial/Residencial
Project Area750,000 sq.m
Project ValueUS$ 400 million

Founder’s Mission

Led the consruction team for design review, consructability validation and construction for the whole project including:

  • Infrastructure
  • Wet and dry utilities
  • Roads
  • Landscaping
  • Turnkey delivery

King Abdulaziz University Housing Project

2014 – 2017

Commercial/Residential Projects

Founder’s Legacy Project

Project is Located at the heart of KAEC, Al-Talah Gardens District spreads over 500,000 square meters. In addition, the housing project enjoys world-class infrastructure and leading-edge amenities, which include a high-capacity storm drainage network, sewage systems, water and power networks, telecommunications and Internet connections, paved roads, street lighting and landscaping as well as safety and security systems.

Once completed, a one-kilo meter pedestrian walkway will allow families to enjoy walking, playing and relaxing in the outdoors surrounded by trees, playground facilities and retail stores

Technical Information

ClientKing Abdullah Economic City
LocationRabigh- KSA
MissionDesign Review and Turnkey Construction
Dates2014- 2015
Project Type: Commercial/Residencial
Project Area500,000 sq.m
Project ValueUS$ 230 million

Founder’s Mission

The Founder’s served as Team Leader representing the Government of Jordan for nationally significant railway infrastructure initiatives, leading project coordination among key stakeholders, Government authorities, international investors, Lead engineering consultant and financial and PPP advisor in addition to the technical specialists and project stakeholders.

This role focused on governance, strategic coordination, commercial alignment, stakeholder management, and ensuring project readiness throughout the planning and development phases.

Rail Freight

The Aqaba Port Railway Project

2024- 2025

Railway Industry

Founder’s Legacy Project

The Aqaba Port Railway project which is a landmark project that involves the construction and operation of the mega freight railway. The project is the largest of its kind in the Kingdom’s history, with a total joint investment estimated at $2.3 billion. The railway will serve as the foundation for a future national rail network, connecting Jordan with neighboring countries, including potential links to Syrian ports and the Mediterranean. The project will help reduce transport costs and improve supply chains, enhancing the competitiveness of Jordanian products with the ability to transport up to 16 million tons of phosphate and potash annually. The 360-kilometer railway will connect Aqaba’s port to a broader transportation network, meeting international standards and significantly enhancing the city’s logistics infrastructure. The railway network will connect phosphate and potash mines to the industrial port through the main tracks serving production sites in Sheidiya and Gor As Safi.

Technical Information

ClientGovernment of Jordan
LocationRed Sea/Dead Sea Jordan
MissionConcept Design/Constructability Review/PPP Modeling
Dates2024- 2026
Project Type: Rail Freight
Project Length(360) km
Project ValueUS$ 2.3 billion
Design Speed 125 km/hour

Founder’s Mission

The Founder’s served as Team Leader representing the Jordan Hijaz Railway Corporation, leading project coordination among key stakeholders, Government authorities, engineering consultants and contractors for project design reveiw and turn-key execution.

Heritage Developments

Hijaz Railway Station at Ma’an City, Jordan

2021- 2025

Buildings and Landscapping

Founder’s Legacy Project

The Hejaz Railway Station (122,000 square meters) in Ma’an is one of the main stations on the historic Hejaz Railway line, which runs from Damascus to Medina in Saudi Arabia. After the restoration of approximately 27,000 square meters and 11 heritage buildings, it was known as the “Founder King’s Palace” and underwent a comprehensive restoration to become a fully-fledged national museum highlighting an important historical period of Jordan.

Technical Information

ClientJordan Hijaz Railway Corporation
LocationMa’an, Jordan
MissionDesign Review and Site Supervision
Dates2021- 2025
Project Type: Heritage Railway Developments
Project Area(122,000) m2
Project ValueUS$ 9 Million

Founder’s Mission

The Founder’s served as Team Leader representing the Jordan Hijaz Railway Corporation, leading project coordination among international stakeholders, Government authorities, engineering consultants and contractors for project design reveiw and turn-key execution.

Cultural/Institutional Developments

Amman Railway Museum

2021- 2026

Special Buildings and Landscapping

Founder’s Legacy Project

The Project includes (Funded by TIKA of Türkiye):

  • Rehabilitation of existing old buildings with 500 m2 and landscaping of around 6000 m2
  • Building a new three-stories 3000 m2 museum for Hijaz Railway history

The museum will have traditional and technology-based objects

Technical Information

ClientJordan Hijaz Railway Corporation
LocationAmman, Jordan
MissionDesign Review and Site Supervision
Dates2021- 2026
Project Type: Cultural Developments
Project Area(9,500) m2
Project ValueUS$ 8 Million

Projects/ Corporate Experience


Mission

Track Dynamics provides the necessary cost estimation including all direct and indirect cost for each BOQ items and estimate the necessary contingency. This includes deep technical review for all design drawings, project specification …etc, to accurately make the cost estimation.

Freight Rail

The Riyadh Rail Link Project (RRL), KSA

2026

Railway Industry

Corporate Experience

The Riyadh Rail Link (RRL) is a 35 km double track rail corridor designed to connect the North-South Railway (NSR) with the Riyadh Dammam Line (RDL), forming a key segment of the wider Saudi Landbridge network. The alignment bypasses central Riyadh and provides a strategic freight and passenger connection across the Kingdom.

The RRL will therefore be a mixed freight and passenger non-electrified railway line, with axle load capacity for Copper E 80 (EM 360) freight trains and a design speed of 160 kph for freight and 250 kph for the passenger.

The alignment of the RRL has been broadly divided into five key zones with specific characteristics and stakeholder requirements.

Technical Information

ClientSAR / Bidding Contractors
LocationRiyadh, Saudi Arabia
MissionCost Engineering and Tendering Consultation
Dates2026
Project Type: Freight Railway
Project Length(35) km
Project ValueUS$ 150 Million
Design Speed200 km/hr

Mission

Track Dynamics provides the necessary cost estimation including all direct and indirect cost for each BOQ items and estimate the necessary contingency. This includes deep technical review for all design drawings, project specification …etc, to accurately make the cost estimation.

Freight Rail

North-South Railway Project, Phosphate 3 Freight Rail Link – Depot & Loops 1–3

2026

Railway Industry

Corporate Experience

The Project is part of a four-package overhaul to add second parallel tracks, upgrade signaling, and increase annual phosphate freight capacity to over 9 million tons.

Project Overview & Key Specifications:

Depot Works: Construction and servicing facilities dedicated to supporting the increased fleet and track operations along the northern industrial corridor.

Loops 1-3: Installation and integration of three distinct operational loops to optimize passing and turnaround times for heavy-load freight trains.

Technical Information

ClientSAR / Bidding Contractors
LocationEastern Province, Saudi Arabia
MissionCost Engineering and Tendering Consultation
Dates2026
Project Type: Freight Railway
Project Length(100) km
Project ValueUS$ 175 Million
Design Speed200 km/hr

Mission

Track Dynamics provides the necessary cost estimation including all direct and indirect cost for each BOQ items and estimate the necessary contingency. This includes deep technical review for all design drawings, project specification …etc, to accurately make the cost estimation.

Freight Rail

North-South Railway Project, Phosphate 3 Freight Rail Link – Section 2 & Loops 4–8

2026

Railway Industry

Corporate Experience

The North-South Railway Project Phosphate 3 Freight Rail Link – Section 2 & Loops 4–8 is a major infrastructure tender issued by Saudi Arabia Railways (SAR) to double-track and expand its national North Train freight network. The multi-billion-riyal project directly supports the Saudi Arabian Mining Company (Ma’aden), helping transport an additional 3 million tonnes of fertilizer annually from northern mining hubs like Waad Al-Shamal to the industrial export port at Ras Al-Khair.

Project Overview & Key Specifications:

Track-doubling works spanning more than 150 kilometers.

Loop Upgrades: Upgrading Loops 4 to 8 along the freight corridor to accommodate higher traffic density.

Core Functions: Converting side tracks into mainline operations, performing alignment modifications, and widening hydrological culverts.

Strategic Goal: Transitioning the mining corridor into a fully double-tracked mainline to remove bottleneck points.

Technical Information

ClientSAR / Bidding Contractors
LocationEastern Province, Saudi Arabia
MissionCost Engineering and Tendering Consultation
Dates2026
Project Type: Freight Railway
Project Length(150) km
Project ValueUS$ 150 Million
Design Speed200 km/hr